Tuesday, December 20, 2011

How to Tell if Your Customer is Prepared for the Project

We would like to think that our customer – the one who is spending the money – has been diligent in their preparation for the upcoming engagement that you are about to lead for them. It only makes sense, right? If they are prepared, that means smoother sailing, possibly a shortened project window, and a decreased project budget. Cost savings for the customer! A good thing, right? One would think so, but I never cease to be amazed…..

What should your customer come to the table with? Well, at a minimum, they should have the following:

#1 - High level requirements

The customer who comes to the table with no requirements planned out is a huge red flag. Certainly you should expect to help them to some degree with requirements – and it’s absolutely necessary for you to help them flesh out more detailed requirements in the planning phase – but when they come to the project with nothing it’s time to put on the brakes.

#2 - A group of subject matter experts (SMEs)

During the engagement you’re going to need access to some end users and subject matter experts because there will be questions you’ll have for them as you try to piece together the requirements you’re working with. These people need to be identified up front and need to be prepared to be adhoc members of the customer’s project team.

#3 - An assembled core project team

If you’re dealing solely with the project stakeholder at the kickoff meeting, then you’re customer may be unprepared. They need a core team of their own to assist you and your team in putting more detail into the project, identifying issues and risks, and verifying the project schedule that you’re proposing.

#4 - Preferably a project manager or point person

Again, dealing with a stakeholder is great and that person may, indeed, be the project manager. But if not, there needs to be a primary counterpart on the customer’s side to you as the project manager. Someone you can go to to get things done on their side. Someone to enforce accountability and direct activity because there will be customer assignments.

#5 - Training or software knowledge (if applicable)

This is a tough one and the customer may push back, but if you’re dealing with a software or IT project, then in order for you and your team to get the best possible requirements documented, your customer must have an understanding of what you’re implementing. If they don’t understand the capabilities at all, then they can’t truly fully understand how much or exactly what the solution will be able to do for them. Basic training is a huge plus to the project.

How do you know they’re ready?

So, I’ve presented a list – and I would welcome any comments or additions that any of our readers might have. This list is based solely on some of the frustrations I’ve encountered on the many projects I’ve led over the years. I’m constantly surprised by how unprepared some customers are when they come to a kickoff meeting.

How doe we figure out if this customer is ready or not? It may become evident as you start to go through the statement of work (SOW) because most of the project goals and assumptions are listed there. If the SOW discussion surprises your customer and they seem uncertain of what’s expected of them, it may be time to slow things down. If you are implementing a software solution and the customer has no knowledge whatsoever of its capabilities, then there’s no way they’re really going to be ready to discuss detailed needs and requirements. You likely need to offer training. Ask about their project team because you’re going to need that information for assignments in the project schedule. If they don’t have a team, then you may want to give them a week to put the proper team together. Discuss the project schedule that you’ve drafted. If there are any major sticking points with the customer, then halt the kickoff and get those ironed out before proceeding with the engagement. The worst thing you can do is start the project before both parties are prepared to start because you’re going to find yourself behind schedule very quickly as you work with your customer to identify and fix these weaknesses.

Brought to you by www.project-drive.net.

Thursday, November 10, 2011

Keeping Your Team Focused on a Long-Term Project

As the project manager on a long-term project, I usually have no trouble maintaining focus. I realize that the project is mine to succeed or fail with – hopefully succeed – and I usually have several projects running at once. Focusing on the tasks at hand usually doesn’t seem to be an issue for me. Now for my team…depending on what’s going on with the project and what other projects my team members may be working on…that focus issue can sometimes be a problem.

As a result, I’ve had to ‘experiment’ with different strategies to help keep my team members focused and engaged on the project. Through logical thinking and some trial and error, I’ve come up with these five strategies for keeping my team members fully focused on some of my longer-term projects.

Engage them in all planning activity

Project team members who are heavily involved in the upfront planning activities on a project feel a greater sense of ownership for the project. Being part of that conception phase of the project leads to a greater understanding of everything involved with the project and greater ownership of the goals, mission, and tasks associated with the engagement as a whole.

Have team members peer review all deliverables

Another way to increase ownership and focus is to have all of your team members perform peer reviews on every deliverable that goes to the customer. This serves another valuable purpose as well – it keeps more eyes on each deliverable and can significantly decrease your chances of delivering an error-filled document or product that only serves to damage customer confidence and satisfaction. Trust me, I know. I trusted a business analyst when he said a functional design document was ready to go to the customer…not once but twice! Since then I have my team peer review everything. It took far too long to make that customer feel comfortable with me and my team again.

Keep task assignment steady throughout

When possible, spread your assignments for your project resources out over the life of the project. Too much downtime for a project resource can cause them to lose focus or worse…can lead to them being completely lost to another project. By keeping them responsible for tasks and engaged throughout with steady work will keep them feeling like they are constantly contributing and will help keep them continually focused.

Look to team members to interface with the client regularly

Putting your project team members in significant roles in the project – especially putting them in roles where they must regularly interface with the customer – can have very positive affects on their ability to stay focused. Knowing their role is key to customer satisfaction and interaction will keep them on their toes and increase their overall participation level on the project.

Have team members periodically lead key meetings

Taking the previous item a step further – have members of your project team periodically lead customer meetings or weekly status calls if you’re comfortable with it. Make an excuse periodically to not be available and assign leadership to someone on the team – rotating the leadership responsibility, of course. Being in a temporary PM leadership role in front of the customer or on the other end of the phone will further induce the focus aspect you desire throughout the engagement from your team members.

Summary

Project team members will lose focus periodically throughout an engagement. It’s your job as the project manager to do everything you can to minimize those instances through continuous interaction, engagement, and assignments. Utilizing team collaboration helps promote ownership that also helps to keep those team members focused and engaged throughout a long project. Your project team members are likely as busy as you are and working multiple projects so being aware of that and utilizing them where they provide the most strategic advantage helps you, helps them, and helps the project.

Wednesday, October 26, 2011

Project Management for Startups

I’ve worked with several startups in both capacities - as an employee and as a consultant. Frankly, I enjoyed the consulting role more, but that’s just me. One thing is for sure - I definitely like working with and for startups. It’s energetic, you own your own role, you often make your own rules…the project is really really really yours because everyone else is so busy and trying to figure out what they need to do next. Take it and run with it is usually the mentality of a startup. Exciting and trailblazing.

Now let’s focus solely on project management. Is it needed in a startup? Is it feasible to have a structured project management process in a startup? If both of those are yes, how do you do it? What does it take to set it up? Lots of structure…a little structure? Let’s consider…

Do startups need PM?

I’m going to answer with a resounding ‘YES!’ to this one. Why? Because they are new, they are trying to establish sound business practices, and they are trying to obtain and retain customers. If a startup embarks on projects without one or more experienced project managers and some defined processes, the only thing that will get them success is luck and you can’t really build a successful business on luck…not for the long-term anyway.

Is it feasible to have a structured PM process in a startup?

Again, my answer is yes. I’ve done it. I was asked to come in to a startup and salvage their first three projects that were failing miserably. I wrapped PM processes around it, brought customers in for presentations on how things were going to be done, and we ended up with three successful implementations AND the makings of a PM practices at the same time.

How do you set up a PM practice in a startup?

In my case, you come with your own tools. They literally had nothing. Well, they owned MS Project, but this was a few years ago. Today a startup would be far better off with a cost-effective web-based solution like Project Drive or a similar tool. MS Project is just too expensive for most startups if they need licenses for multiple users and it’s just not necessary.

You need some templates in hand…project schedule shells from past projects, plan documents that you’ve pulled from other successful engagements, a budget planning and forecasting tool or spreadsheet that has served you well in the past. They likely won’t have anything…so you either need to have it with you or search the internet for something to download. I offer several templates and sample documents for free download on my website at bradegeland.com.

And finally you need to assess how much staff you need. Most startups, when their business is ramping up, should be able to make do with one or two consulting project managers. Hiring permanent staff right out of the gate is probably a risky idea. Adding experienced consulting PMs can get you started down the right path and they can then be used to help you in the hiring and training of more junior level project managers who can eventually take over the reins.

Brought to you by www.project-drive.net.

Thursday, September 22, 2011

Finding Your Niche as a Project Manager

What are you good at? At what do you excel? What areas are project team members frequently complementing you on? Do you get positive customer feedback in a particular area on a regular basis?

For me it’s communication. I once had a business analyst tell me that of all the project managers he’s ever worked with, he received by far the most email from me. He said he felt that he was included on all communications and always knew the latest status and where things stood on my projects. That made me feel good because I consider communication to be the #1 responsibility of the project manager. If you’re doing that right, then that’s half the battle.

Capitalize and accommodate

Everyone has his or her own strengths and weaknesses. No one is strong in everything. Think about those job interviews – you’re asked about your strengths and weaknesses. You know you have some weaknesses – you may even have a huge glaring weakness that you certainly can’t tell them about, but you have to tell them something during the interview because even they know that no one is perfect. But seriously, in order to be successful we absolutely must know our strengths and weaknesses – both in order to capitalize on our strengths and accommodate for our weaknesses. We have to find our niche – what we excel at – and run with it.

Like I said, for me it’s communication. I’m also pretty good at organizing, but I’m best served having a strong business analyst along side me on a technical project who can serve as that person to document the customer need well and ensure that we continue that process as the skilled technical team takes over and creates technical specs from functional requirements. I’m technical – I used to be a developer and an application development manager and have led developers on projects for years as well as being able to estimate development efforts with the best of them – but I’m best left to coordinate, communicate, assign and delegate and leave the detailed documentation to the skilled project team resources.

Why projects fail

More projects fail than succeed. I’ve always stated that more than 50% of all projects fail. A recent number I saw in a Project Management Institute LinkedIn group study showed that approximately 76% of all projects fail to some degree. That number is huge. Some just will fail because they’re poorly defined or never should have happened. Some will fail because funding will run out. Others will fail because of senior management or the customer brings it crashing to the ground because of ever-changing requirements. It’s hard to say what will cause a project to fail until you’re in the middle of it.

Project manager failure points

We must also admit that many projects will fail because the project manager was not equipped to handle the project. Either they didn’t understand what their limitations were, couldn’t communicate with their team or manage the customer well, or weren’t good leaders or decision makers, or we’re very organized. It could be one of a hundred things.

The key for a project manager is to understand how they think and work professionally and what they’re good at and what they must admit that they are not good at. Most importantly, they must recognize those weaknesses and filter those responsibilities to the team whenever possible. Then, and only then, will they give their projects and team members their greatest chance at overall project success.

Brought to you by www.project-drive.net.

Tuesday, September 6, 2011

Getting the Right Information to the Right People

As the purveyor of good, sound, efficient, and effective communication, the project manager must ensure that he’s not just tossing whatever status info into the air that he feels like to see what sticks to what individuals. After all, giving a C-level customer information on what scripts you ran today while testing the latest bug fix is not an example of good, sound, efficient, and effective communication, is it?

I’ve even gone so far as to create what I would consider a very detailed, yet high-level status report for the client project sponsor of an organization I was consulting for only to have him wave his hands in the air and say, “I don’t want to see this level of detail.” I was astonished, because I thought it was exactly what he would want to see. Next I gave him a detailed issues list with dates, assignments, and status updates and he exclaimed something like, “I’m in heaven, you get it!” You never know who wants what till you try, I guess.

It all depends on the individual – that end user of your information. As the project manager you can spend hours putting together great detail every week but if it’s the wrong information for the wrong individual – even if it’s great info – you still failed.

Set and get expectations early

As the project manager you want your status information to be seen by the masses – for your career, for your reputation, and for the visibility of your project. But you also want to make sure that the status information you send out means something to the receiving parties. In my example above, what I originally prepared was going to be totally ignored by my customer and he wasn’t going to be very happy in the long run.

Go into project kickoff with your customer with an example of what information you intend to disseminate on a weekly basis. Use that as a starting point to work from. This is the best time to get their input and to fine-tune the details that you provide them with. You may even need to create a higher-level summary report for their senior management. And, of course, meet with your senior management and identify key data that they would like to see on an ongoing basis. They aren’t likely going to want your detailed issues list, but they probably will want your budget analysis and forecast every week – that means a lot to them especially if you’re managing a large, high-dollar and profitable project.

Refine as needed

Finally, refine what you provide each party as needed throughout the engagement. Rarely do I find that my first status reports on a project are identical in format and content to my last. Things change, needs change, priorities change – and all this affects who wants what from the ongoing status information on your engagements. One solution is providing a customized project management dashboard like the one offered in Project Drive, the effective web-based project management software product.

Summary

Project managers must be rigid at times and follow best practices in order to help ensure project success. But project status reporting is one area that where it’s ok for the project manager to show flexibility. After all, it is the project manager’s responsibility to be effective and efficient communicators and the foundation of that is getting the right information to the right people at the right time so that good and timely decisions can be made for the project.

Brought to you by www.project-drive.net.

Wednesday, July 27, 2011

The PM's Role in Project Profitability - Part 1

Who has overall responsibility for the profitability of a project? Sales? The VP of Marketing? The CEO? The project manager? The project team? Sales is responsible for making a deal on the project that is targeted to make money for the company. The VP of Marketing is responsible for staffing sales and account managers and business development to go out and find new sales opportunities and to create new business for the organization. The CEO has overall responsibility for the organization and it’s profitability. If it flounders for an extended period of time, it will be the CEO who resigns. But in terms of overall responsibility for the budget and profitability of the project….that’s the project manager.

So we’ve established that it’s the PM’s role to maintain the project budget and guard the overall profitability of the engagement. How does that happen? What can the project manager do to ensure project profitability? What actions can he take to help guide the project to an on budget delivery that means it met its financial goals and ultimately ended on a profitable note?

Meticulously manage scope

Most any project manager would tell you that a project’s financial health begins and ends with scope management. And the project manager who performs scope management the best wins…period. Much is said about scope creep, requirements definition and documentation, and ongoing management of new work on the project. But unless that line in the sand is drawn and the project manager adheres to it and gets his team to adhere to it, profits will be lost, unplanned work will happen to make a customer happy, and the project will mysteriously pull into the finish line 20% over budget.

It’s easy when our very skilled developers are working closely with subject matter experts on the customer side for them to incorporate ‘nice-to-haves’ that come up during meetings. The problem is, these ‘nice-to-haves’ aren’t actually part of the documented project requirements that the end solution is being built against. It is the project manager’s responsibility to educate his project team about the dangers of such activity. Five extra hours here, ten extra hours there, more testing time and suddenly you find the project several thousand dollars off the mark budget wise.

Only perform work that is documented by requirements and ensure that all other requested work is turned into change orders that are priced for the customer to review and decide whether or not to pay for. Change orders make the project more profitable by allowing the delivery organization to get paid for that work and they make the customer happy by getting work that they want added on actually documented, completed, tested, and part of the final solution.

Frequent and purposeful revision of the project schedule

If the project gets out of hand, profitability will likely go with it. Many project managers in matrix environments are managing several projects at once. With so much going on, it’s very easy to lose track of what tasks are happening when – also making it very difficult to keep the project team in check and hold them accountable to their project tasks that they are responsible for.

It’s definitely not enough to put the project schedule together and leave it alone. On some projects, PMs start with a detailed schedule produced from project management software and then they put it on a shelf. That can’t happen - it must be a living, breathing part of the project and it – along with the weekly status report – should drive the weekly formal project status meeting with the customer. A regularly distributed, up-to-date project schedule lets each team member know what tasks they should be working on and keeps the team focused on the work that should be happening. Meaning your time, effort and dollars are being spent on the important work – and helping to keep the project profitable.

In Part 2 of this two-part series, we’ll examine three more ways the project manager can help keep the project on track and profitable throughout it’s lifecycle.

Brought to you by www.project-drive.net.

Wednesday, July 13, 2011

Take Your Project to the CEO

As project managers, we often wish there was a way to ‘get our way’ on our projects. Get the resources we want, secure the proper equipment for testing, and maybe increase the project budget to get the entire team onsite for a project milestone celebration with the customer. But, alas, we’re so busy with the day-to-day management of our project – and it may be one of several projects that we’re leading at any given time – that we don’t have the time or energy to make too much noise about it. If only there was a way to make things easier to get what we ‘need’ for our projects – and to sometimes just get the things we ‘want’, too.

What we find often is that in order to get things accomplished for our projects and on our projects and to gain the visibility we need to get there, there are some steps we need to take on our own. We essentially must ‘market’ our product to get the things we need for it to help ensure its success and to help ensure the overall satisfaction of our customer on the engagement. And there’s no better person or persons in power to market your project to than the CEO or top-level senior leadership within your company. The three proactive actions that I’ve found to work best for me are discussed below.

Send your project status report to senior management

A very easy first step is to include your CEO or senior management on your regularly weekly status report distribution. As long as they have your status report on a regular basis then they know who you are, who your customer is, and what’s going on with your project on a weekly basis. That’s probably 100% more visibility than most of the projects in the organization.

If your CEO knows your project and knows your needs, then you’re more likely to get their attention when issues arise – like resource availability or technology needs. You’ll be seen as proactive and on top of your project and you’ll be surprised how quickly help will be on its way when needed.

Have the CEO or other senior management attend a status meeting

Invite the CEO – or some level of senior management – to your next status meeting. Think of a reason – any reason – that will get them there. Maybe an important issue is being discussed that requires a key decision and you’d like to have them hear about it and be involved.

By getting the CEO involved in your status call with the customer you will be serving two purposes that will help your project from this point forward. 1) Your CEO or senior leadership will be even more aware of you and your project further entrenching their interest in your project’s well-being. And 2) the customer’s satisfaction level will immediately rise because now they think their project is important enough to your organization to warrant this type of personal involvement from the top. Not many projects get that – but then not many project managers go to this level of effort to make it happen.

Invite the customer to your site

One more thing you can do is to invite the customer to your site if they are not local or if this is not already a common occurrence. Invite them for a tour, or a face-to-face meeting with your leadership, or possibly even a disaster recovery demonstration by your IT staff if that’s relevant to what you’re doing for them on this engagement.

Bringing the customer onsite can definitely boost the profile of your project within the organization because there will be some specific preparation that will have to happen and likely some post-visit follow-up and communication between the customer and your senior leadership.

Summary

I’m certain there are many more ways you can make your project more visible – these are just three. However, gaining the attention and involvement of senior leaders in the company in your project – in a good way rather just when disaster strikes – can bring instant visibility to your project. And once that happens, it’s far easier to gain help with resource and technology acquisition, project funding, and the general knocking down of those annoying roadblocks that often get in the way of our project and a successful end solution.

Friday, June 24, 2011

Achieving Success One Project at a Time

There's no question that every project manager would like to experience success on every project. The reality, though, is that more than 50% of all projects end in failure to some degree. Maybe not total and utter failure, but they fail to some degree to reach full customer satisfaction, or end user usability, or hit the mark the project budget, or get delivered on time. In some way or another, more than 50% are not fully successful.

Even in project failure we can learn something to take forward to the next project, and the one after that, and so on. When we learn to ride a bike we crash, we fall off, we run into the side of the garage. But eventually we get it. And we get better each time we ride the bicycle. That's how project management works as well. We may be terrified as we run our first project and any success we experience may be purely due to luck or that it was a simple project or that we receive lots of help getting there. But we learned something. And we learned more on the next project, and so on. We eventually get to that point 20 years down the road where we can look back and see a path of many project successes that have build us a solid reputation as a skilled project manager.

As we establish our reputation as a good project manager one project at a time, there are a few basics that we must remember and try to incorporate as part of our normal flow of managing the project. Doing this will help us to ensure that our continued success is due to planning and experience and not relying on luck for most of our successes:

Produce planning documents

Those documents that seem like placeholders at the front of the project: the communication plan, the risk management plan, the resource plan, the project charter, etc. are actually important documents. We produce them and get them signed by the customer and then we have a benchmark to work from. We skip them and have no agreement on those processes with the customer and we leave open the possibility for questions and interpretations throughout the engagement. Choose the former, not the latter.

Do the fundamental things

Produce weekly status reports. Hold weekly status calls. Meet regularly with your project team to touch base even when there isn't a lot of work going on. Maintain the project budget and resource plan meticulously. If you continually do these things regularly throughout the project and don't skip meetings you set solid expectations with your team and your customer. As a result you keep project participation high, accountability high, and customer satisfaction high.

Practice the best communication possible

Don't assume your team and your customer understand something or always know what's going on. Don't assume that everyone knows what's expected of them. Always strive to practice efficient and effective communication throughout the engagement and you'll see the results in positive ways from your team and from the satisfaction level and participation level of your customer. Communication like this is critical to the success of your project.

Conduct lessons learned sessions

Finally, don't skip the lessons learned sessions. Even though it becomes increasingly hard to focus on the project after implementation and as you and your team begin to drift to other projects, schedule this session with your team and your customer and go through the project and what happened good and bad. It's important and you'll learn from it.

Summary

We take each project individual and methodically, following best practices to achieve both success (hopefully) and, more importantly, valuable experience. Even project failures help us to become much better project managers if we learn from them.

Practice best practices, stick to the basics, document requirements well and allow for proper planning, and then communicate effectively for your best chances of success.

Friday, June 17, 2011

Strategies for Onboarding New Project Resources

There are several reasons why new resources would be onboarded mid-stream on a project:
  • A project resources moves to another project
  • A project resource has left the company
  • A project resource is performing poorly
  • A new skill set is needed on the project
  • Additional resources are needed to get the job done
The list can probably go on and on. The reasons can vary, but what can't change is the fact that onboarding a new resource must be done as quickly, efficiently, and effectively as possible. It needs to be performed as seamlessly as possible so that the project doesn't skip a beat. It needs to seem to the customer as though it never really happened - it should go that smoothly. Ideally, it's as smooth as changing the name in the your project management software tool to the new resource. Because anything less and your project is in danger as well as the confidence that you have built up in your customer in the ability of you and your project team to deliver on the engagement. If a changing of the guard on the project causes bumps, then your customer is going to feel them and that is never good.

First, you must assess the situation in terms of the outgoing resource and their status on the project. Consider these questions when assessing this...
  • How key is this person's role on the project?
  • How critical is their expertise specifically for this customer's requirements?
  • How involved have they been so far with the customer?
  • How can we get a new person engaged quickly on the same knowledge level?
Understanding these issues can help you get the right person in the role and transition to the best of your ability in order to minimize the affects on the project and the customer.

So, let's look at key strategies or processes for bringing on new resources to your project in mid-stream.

Provide all project materials

The first step of the process is to get a new resource anything and everything that you possibly can on the project. Of course, this works best if they have some time to get up to speed and aren't immediately thrown into the fire on the project. If the outgoing resource isn't already gone, but has an exit date set, then this entire process - including the next steps below - will be much smoother and it will likely affect the customer to a far lesser degree.

Provide the incoming new team member with everything that was put together for project kickoff including the statement of work for the project. Also, get them the current and recent versions of the project schedule produced from the project management software tool, weekly status reports for the past two months at a minimum, the current versions of the issue lists and risks lists, copies of all deliverables produced and delivered to date, and resource forecasting and budget information - if applicable - for the project.

Direct contact knowledge transfer

If possible, the incoming resource needs knowledge transfer time from the outgoing resource. If the outgoing resource has left the company or was an utter failure on the project, then this step is either not possible or not necessary. But in the case where they are leaving for another assignment, then secure time away from the team and the customer for the two resources to discuss the role, the project, and the customer and to transfer key project knowledge and status. Ideally, the new resource would shadow the outgoing resource on the weekly status customer call for one to two weeks before actually participating.

Team knowledge transfer

Following, or during, the one on one knowledge transfer activities, conduct a series of unofficial team meetings for the purpose of getting the new resource up to speed and offloading knowledge to the knew resource from all team members. How long this takes will probably depend on the urgency of the situation and the number of team members on the project, but one or two meetings should be enough in most cases.

Customer introduction and transition

Finally, conduct an introductory meeting with the customer where your new resource is introduced and can discuss his or her background and what their role will be on the project. Ideally this will be a separate call from the regular weekly status meeting and would also include the outgoing resource. However, that's not possible in all scenarios and it may have to happen as part of the formal weekly status meeting.

Wednesday, January 26, 2011

Using Collaboration and Communication to Ensure Project Success

Using Collaboration and Communication to Ensure Project Success

In my opinion - and I believe many project professionals' opinions - the number one key to project success is effective and efficient communication. I don't mean sending emails every hour on the hour. That's neither effective nor efficient. That is a waste of time. Information overload is not really helpful for anyone and your project resources will come to resent you - the project manager - for filling up their days with useful reading. In fact, they'll learn to tune your verbal and written communications out if you are an ineffective communicator. Why? Because they'll feel they have better things to do and that you're not really adding any useful information to their efforts.

Along with effective and efficient communication on projects is the concept of collaboration. Collaboration can have many meanings in the project management world. In general, the best way to solve the project collaboration issue is by utilizing a solid project management tool like Project Drive's web-based project management and collaboration tool.

Let's look at and discuss four keys to effective communication and project collaboration:

Creating a project communication plan

One item that is critical, but often overlooked, is the project communication plan. When the project manager puts a detailed, official project communication plan together at the beginning of the project he is telling everyone that this is how information will be processed and delivered on the project. It sets an expectation with the project team and the customer, it can be another paid deliverable on the project if planned right - thus increasing revenue, and it adds to customer satisfaction and confidence because they know there's a plan in place that they can hold you to.

Producing timely project status information

Of course, once a communication plan is in place, you MUST follow it. And one of the key areas of project information dissemination is through the detailed weekly status report. Produce and deliver a detailed status report and revised project schedule at least one day in advance of the project status meeting with the customer and don't deviate from the schedule. Likewise, be diligent about delivering updated relevant project status information through effective emails throughout the week - don't wait for weekly status call to get important information out to everyone. And always follow-up the status meeting by sending out notes to all participants to ensure that everyone understood what was discussed and that all parties are on the same page.



Conducting regularly scheduled informational meetings

As mentioned above, plan to hold regular weekly official status calls with the customer. It's your chance to check up on the customer's progress on any assigned tasks, provide the customer with detailed updates on your team's progress, and review and discuss any outstanding issues and risks. Just as important, though, are weekly informal status meetings with the entire project team. This is the project manager's chance to get all status information from the team, discuss decisions that need to be made and any concerns team members might have, and to discuss newly assigned tasks and give proper direction. Use this time to prepare much of the discussion that will take place during the official formal weekly call or meeting with the customer.

Using an effective scheduling and collaboration tool

Finally, choose and effective tool to both manage your project schedule and allow for team collaboration on the project. Choosing a good web-based collaboration tool like Project Drive is often a good idea and can drive effective and efficient communication and information-sharing on the project, as well as making your project team members responsible for providing their project task updates to you with no excuses.