Friday, December 9, 2011

When Your Project Depends on Other Projects that are Struggling

Managing a project to a successful end is hard enough as it is. Most of the time your project is a one-time effort and it is completely standalone – other than the fact that it likely integrates with some existing technology and business practices. Those, of course, become integration points and separate tasks in the schedule as well as areas of testing concern and highlights as the project moves on towards deployment.

Now consider the scenario where your project depends on the outcome or progress of one or more other projects. Projects that you likely aren’t even leading, but must be involved with to some degree to ensure proper testing, handoff of information, timing of training and deployment, and to ensure that any solution integrations are properly aligned. If those other projects are running smoothly, then you have no issues. However, if there is a delay or an issue with one of the other projects – and most projects do experience delays and issues along the way – what do you do? How do you handle it? How does it affect your project?

In the few cases where this has either been an issue for me or appeared that it would be, these are the steps I setup to get corrective action rolling…

Discuss with the customer

As this has always been the case with interrelated projects for the same customer, that customer is an integral part of the team on each project and a key decision point for any action going forward. If that customer is not already aware of the impending critical problem, then you – and the other project manager if the struggling project is not also yours – must sit down with the customer and relay the issue to them. Keeping a significant problem from the customer will only delay the inevitable and can serve to cause trust issues should the customer discover the problem before it comes from your mouth.

Brainstorm with the other project managers and teams

You and your team must then work cohesively with the project manager and team on the struggling project to determine what their issue is, how quickly it can be resolved, what impact it has on their schedule, and then what the overall impact on your project and schedule is or will be.

Develop an action plan

Next, set about documenting possible action plan scenarios. Will more or different resources on the struggling project help solve the issue? Will more money do it? Are the struggles due to issues at the customer level? Do some requirements need to be further defined and if so, what re-work might be involved.

Once this is determined then – and only then – can you figure out the best and most cost-effective and least detrimental course of action to recommend to your leadership and to the project customer.

Circle back with the customer

Finally, return to the customer with the proposed course of action. Clearly detail to them how the struggling project is going to get back on track – and this should be presented by that project manager if it is not already your project. Then present the impact to your project – the one that was running smoothly till the issue arose – and show them a new project schedule with these effects built into the scenario. If there are any avenues for regaining lost ground on the timeline due to the issues forced on your project, outline those actions as new tasks in the project schedule and discuss those in detail with your customer.

One final step – don’t forget to get signoff/approval from your customer on the overall course or courses of action you plan to take. It may seem like a small technicality, but it can become a very valuable signoff should there be any legal concerns at the end of the engagement.

Brought to you by www.project-drive.net.

Monday, November 28, 2011

Keeping Projects on Track Through the Holidays

Oh, the end of year holidays. Thanksgiving, Christmas, New Year’s Eve and New Year’s Day. They’re all upon us now….we are joyfully celebrating with our family or planning for the next holiday. Vacation time is being requested, countdown calendars are beginning, and – most likely – some focus is being lost as the daily grind is giving way to hopes of some well-deserved relaxation time. Holidays are always hard on projects – but these current holidays can wreak havoc on the best of engagements.

The big question is this….during this time how do we keep our projects on track with so much anticipated – and sometimes unanticipated – down time? Our projects aren’t taking a break, but our project team members – and often our customers – are. How do we keep the forward momentum going? And also, how do we regroup after the holidays and get the project moving forward again at the same pace it was before the holiday slowdown?

Here are five key steps to follow to stay on track….

Plan way ahead

Project resources plan their vacations with their direct supervisor. Sometimes they tell their project managers and sometimes they don’t. Sometimes they assume that their manager tells you – but that never happens. Ask questions, plan ahead. I once found myself with a resource who was leaving for India to get married and not returning for three months right in the middle of critical break/fix testing before a go-live. She assumed that her manager had informed me. Not only had I not been informed, there was no comparable resource available to back fill with. Never assume anything.

Onboard support staff if needed

By planning ahead, you can see if there are some key activities that have to happen during the holidays that can’t be moved. Request a replacement resource during the vacation time if you think it will help – but this will definitely require advanced planning (see #1 above).

Stagger time off if possible

It’s not likely you’ll get much say in this, but have your resources stagger their time off if it all possible. Leaving you as the only project resource available – and probably not able to take vacation time yourself – is a very bad situation to be in. If critical activities have to happen during a planned vacation, you may have no other choice but to go to the resource’s manager and request that vacation time be changed or that other accommodations be made.

Revise the schedule and be realistic

Take the vacation time and revise the schedule. Be as realistic as possible. It serves no good purpose to be too aggressive with the task schedules when you have no project resources available to work on them. If it’s going to cause problems with the deadline of a key project deliverable, then it’s important that everyone knows about it now rather than finding out about it later when you regroup after the holidays and watch that key date come and go. That type of failure does not make customers happy.

Kick start the project January 2nd

Finally, be ready to hit the ground running on January 2nd, or as soon as you can get MOST of your team back on the project. During that first meeting when everyone is back together, be sure to have some fun and discuss everyone’s holiday activities. And then with that out of the way be ready to productively move on. As the project manager, that means that you need to have everything in place including a revised project schedule that shows what the next steps and assignments are on the engagement.

Brought to you by www.project-drive.net.

Wednesday, October 26, 2011

Project Management for Startups

I’ve worked with several startups in both capacities - as an employee and as a consultant. Frankly, I enjoyed the consulting role more, but that’s just me. One thing is for sure - I definitely like working with and for startups. It’s energetic, you own your own role, you often make your own rules…the project is really really really yours because everyone else is so busy and trying to figure out what they need to do next. Take it and run with it is usually the mentality of a startup. Exciting and trailblazing.

Now let’s focus solely on project management. Is it needed in a startup? Is it feasible to have a structured project management process in a startup? If both of those are yes, how do you do it? What does it take to set it up? Lots of structure…a little structure? Let’s consider…

Do startups need PM?

I’m going to answer with a resounding ‘YES!’ to this one. Why? Because they are new, they are trying to establish sound business practices, and they are trying to obtain and retain customers. If a startup embarks on projects without one or more experienced project managers and some defined processes, the only thing that will get them success is luck and you can’t really build a successful business on luck…not for the long-term anyway.

Is it feasible to have a structured PM process in a startup?

Again, my answer is yes. I’ve done it. I was asked to come in to a startup and salvage their first three projects that were failing miserably. I wrapped PM processes around it, brought customers in for presentations on how things were going to be done, and we ended up with three successful implementations AND the makings of a PM practices at the same time.

How do you set up a PM practice in a startup?

In my case, you come with your own tools. They literally had nothing. Well, they owned MS Project, but this was a few years ago. Today a startup would be far better off with a cost-effective web-based solution like Project Drive or a similar tool. MS Project is just too expensive for most startups if they need licenses for multiple users and it’s just not necessary.

You need some templates in hand…project schedule shells from past projects, plan documents that you’ve pulled from other successful engagements, a budget planning and forecasting tool or spreadsheet that has served you well in the past. They likely won’t have anything…so you either need to have it with you or search the internet for something to download. I offer several templates and sample documents for free download on my website at bradegeland.com.

And finally you need to assess how much staff you need. Most startups, when their business is ramping up, should be able to make do with one or two consulting project managers. Hiring permanent staff right out of the gate is probably a risky idea. Adding experienced consulting PMs can get you started down the right path and they can then be used to help you in the hiring and training of more junior level project managers who can eventually take over the reins.

Brought to you by www.project-drive.net.

Thursday, October 6, 2011

It's About More Than the Tools

Tools are great in the project management world. I dare say they’re a necessity if you want to get your tasks done in a timely manner. And doing things in a timely manner is critical if we want to stay on track and on budget.

But really, the tools we use can be anything…depending on the size of the project and the complexity of reporting. You can actually manage a project with only Excel or similar spreadsheet software as your only PM tool if you have to (though probably only on very small projects) – using it for managing tasks and timeframes in the project schedule, managing resource assignments, and definitely the budget. I use it all the time to manage the project budget – including analysis and forecasting on a weekly basis. But I’d never use it on a big project or a critical project. I’m a fan of real project scheduling software like MS Project, Project Drive, or a similar tool. They’ll get the job done faster, better, more accurately and more efficiently and they have reporting built in to the tool – which will make your executive management and customer much happier and your job much much easier.

But project management doesn’t stop with the tools, does it? In fact, it’s really not about the tools. You don’t have to spend the big project dollars on the tools – you can do it fairly inexpensively as pointed out above. But the big dollars are spent on the personnel resources and the tasks they undertake and the time they spend on the project. It’s about project skills and the actual management of the project itself as well as the leadership used in managing the project resources. It’s about project best practices.

Project management, as a whole is really about…

Consistency

Your team and your customer need consistent behavior. You need to hold project status meetings at the same time every week (yes, every week), you need to deliver weekly status reports in advance of that project status meeting with your team and your customer, and you need to be holding internal meetings with your team every week to get updates and hold them accountable. The project manager who regularly postpones or cancels meetings is not displaying consistency and will find it hard to demand consistency from his own team throughout the project.

Best practices

Using best practices – whatever you and your organization define as best practices – is the responsibility of the project manager. Doing things like using repeatable processes and templates that work, conducting formal project status meetings and reviews, planning out the project budget and reforecasting it to stay on top of it on a weekly basis, and managing project scope closely against the project requirements are all a few examples of project management best practices. These are the responsibility of the project manager and using them is a way to display good project leadership and a way to help ensure ongoing project successes.

Leadership

Finally, project management is about leadership. If a project manager can’t be a strong project leader, then he’s not bringing much to the project table. Sound, swift, and confident decision-making, efficient and effective communication and customer management, consistent behavior and delivery on project milestones and deliverables are all examples of good project management leadership and are all the responsibility of the project manager.

Summary

Tools are a necessary part of the project management process. But they don’t guarantee success and they don’t ‘make’ the project manager. If the project manager can practice consistency, utilize best practices, and show project leadership, then his days as a project manager are likely numbered. PM is much more about the soft skills than just the use of tools.

Brought to you by www.project-drive.net.


Wednesday, August 10, 2011

The PM's Role in Project Profitability – Part 2

In Part 1 of this two-part series, we established what should be obvious to all experienced project personnel – that overall responsibility for the profitability of any project is ultimately the project manager’s. I also began to look at what I consider to be the key actionable steps that the project manager can take to help ensure project profitability. Part 1 covered the first two of my top five. Those first two actions were:

  • Meticulously manage scope
  • Frequent and purposeful revision of the project schedule

In this final segment, we’ll examine three more steps: careful management of project resources, involving the team in managing the budget, and reviewing the budget with management and the client. Let’s look at each of these in more detail.

Manage resources carefully

A good team of project resources may very well be your key to project success. Indeed, finding – and keeping engaged – the best and most relevant skill sets for the project solution at hand can mean the difference between a successful deployment and a project gone horribly wrong. But the project manager who can’t skillfully manage those talented and high-priced resources and keep them focused on the assigned tasks is destined to deliver a final solution that is neither profitable nor on time.

See, talented technical resources have egos. They know they can do this or they’re certain they can do that. And they are certain the can do it fast. When working with client project team members closely on key functionality of the project, they may be inclined to gold plate functionality or even add new functionality that “shouldn’t take much time” even though it’s not part of the agreed upon scope of the project. Those ‘small details’ add up and in the end you can find yourself giving away a pile of extra hours (dollars) of development time that you never counted on.

The key for the project manager is to use project management software and keep the project schedule in front of the team members, remind them weekly – daily if necessary – what key tasks they are to be focused on and remind them not to add functionality. Educate them in the change order process and make sure they come to you if the customer is asking for more than we’re supposed to provide. That’s called extra functionality and if you work it right, it’s also called project profitability.

Engage the team in budget management activities

The project manager who sits down regularly with the project resources to review the budget status and budget forecast is much more likely to keep the project budget on track than the project manager who does not make his team aware of the financial aspects of the engagement.

Project resources are required to account for their time and charge their time to the projects they are working on. That’s how your project gets hours charged to it. All project resources have ‘grey hours’. Those are the hours that they know they worked in a given week but can’t remember specifically what they did or which project they did it for. It’s often about 10% of their time, maybe more. If they overcharge hours to your project – meaning if they add their ‘grey hours’ to the engagement you’re managing – that can mean your project is getting 10% extra hours….and dollars….charged to it each week by each resource. Don’t be the project manager who is perceived as the one who doesn’t watch the project budget closely and you won’t be on the receiving end of those ‘grey hours.’

Review the budget with senior management and the client

Finally, regularly review the project budget with your senior management and with the client. This is helpful for two reasons:

  • Educating the allies. The onus is still on you as the project manager to deliver a profitable project. However, by educating your senior leadership and your client along the way in the health of the project budget you’ve now gained two allies interested in helping right the project budget should it start to go wrong. Both of these parties are stakeholders in the success of the project. Keeping them informed early and often means they’ll be aware along with you when the project budget starts to become unhealthy – and not just when it’s already too late to fix.
  • Forcing accountability. If you have educated the client and your senior management as to the status of the project then there’s really no undoing that. You’ve now forced accountability of yourself to them and there’s no turning back. This can be a good thing. Managing multiple projects isn’t that easy, but it’s usually a fact of life for most project managers. Keeping yourself accountable for key areas of the project - like the budget in this case - is helpful and will keep you focused and not inclined to cut corners.

Brought to you by www.project-drive.net.

Thursday, July 7, 2011

Managing Projects Through Uncertainty

These are definitely uncertain times. The economy is still tanked in the US. In some US cities one out of every seven house sit empty, real unemployment rates are running as high nearly 30% (After adjustments), and there are approximately five unemployed applicants for every one open job. Uncertainty and chaos at its best.

So it should be of no surprise when we experience uncertainty in our projects and with our project customers. After all, the very same uncertainties I've already mentioned are affecting our companies, our client companies, and nearly every single financial decision being made. How can anything be stable? How can we be certain that our project won't be halted or completely shut down tomorrow? How can we be certain that our project management jobs will be relevant and needed next week? How can we know for sure that our project teams that our customers are counting on won't be disassembled due to layoffs or needs on more important projects next month right in the middle of critical tasks? The answer is we can't. We can never be certain. Even in good times we can't be certain of these things as managing projects is really all about managing change, isn't it? I've had most or all of these things happen to my projects and teams in good times and bad due to forces and conditions that are often beyond my control or influence.

We don't take on the role of project manager because it feels safe. Project managers generally know things can change or happen during the course of any engagement that can greatly affect the outcome if we aren't prepared for it. It's called risk planning and risk management. We just have to be aware during very uncertain times that there are additional risks that may need to be considered and planned for.

So, do we really do things differently when we're managing in uncertain times? And by uncertain times I mean with our jobs, our company's status, our client's stability, or our projects financial or technical viability. Do we do things differently? In my opinion, yes, at least a little.

When I'm managing a project during what I would consider unstable or uncertain times or circumstances here's what I focus on:

Solid documentation

Document, document, document. It's a tedious task unless it's for deliverables that are already built into the contract and we're getting paid for them. But during uncertain project times it becomes even more critical. The more documentation that's available, the easier you can onboard new team members if your project team is unstable. And, more documentation means you have yourself well covered if customer questions arise concerning your team's performance on the project.

Thorough risk management

We all perform issue management - it's hard not too when issues arise. But really performing risk management and doing it right is something we often overlook or gloss over. Not only is risk management and planning critical, it's even more so when times are uncertain. Different things need to be planned for such as work stoppages, technology solution changes, or sudden project resource losses.

Effective communication

Communication is job #1 for the project manager and it's never more evident than when you're dealing with unstable project situations. It's extremely important to keep your project team and the customer well informed of project status, project schedule, and all issues at all times - especially when your project is running through turbulent waters.

Customer satisfaction

There's not really any one thing you can do in terms of customer satisfaction. There's not one thing you can specifically do to guarantee it. But rather it's a cumulative process of maintaining best practices and good communication and checking in frequently with the customer to make sure that their needs are being met. Don't assume your customer is happy...ask them.

Frequent upward reporting within the organization

Finally, keep your senior management well informed on your project. Especially if the uncertainty lies within your own organization. The loudest project manager is usually not the one who gets the ax first. It's the quiet one because they seem more expendable even though they may be the ones who are just the best at taking the ball and running with it. So if you're more independent and good at taking off with a project with little to no senior direction, that's great. But if your company is laying people off, start making some noise. Make sure your senior leadership knows who you are, who your project team members are, and what's happening on your project.

Summary

I realize that these are things we should - and hopefully do - focus on anyway during our projects. But during uncertain times they are definitely key processes that we can't afford to skip or cut back on. If anything, they need increased attention and focus and that's where I generally put in some extra effort. I can't say it's always what keeps things afloat in uncertain project times, but I can guarantee that it has never hurt the project.

Friday, June 24, 2011

Achieving Success One Project at a Time

There's no question that every project manager would like to experience success on every project. The reality, though, is that more than 50% of all projects end in failure to some degree. Maybe not total and utter failure, but they fail to some degree to reach full customer satisfaction, or end user usability, or hit the mark the project budget, or get delivered on time. In some way or another, more than 50% are not fully successful.

Even in project failure we can learn something to take forward to the next project, and the one after that, and so on. When we learn to ride a bike we crash, we fall off, we run into the side of the garage. But eventually we get it. And we get better each time we ride the bicycle. That's how project management works as well. We may be terrified as we run our first project and any success we experience may be purely due to luck or that it was a simple project or that we receive lots of help getting there. But we learned something. And we learned more on the next project, and so on. We eventually get to that point 20 years down the road where we can look back and see a path of many project successes that have build us a solid reputation as a skilled project manager.

As we establish our reputation as a good project manager one project at a time, there are a few basics that we must remember and try to incorporate as part of our normal flow of managing the project. Doing this will help us to ensure that our continued success is due to planning and experience and not relying on luck for most of our successes:

Produce planning documents

Those documents that seem like placeholders at the front of the project: the communication plan, the risk management plan, the resource plan, the project charter, etc. are actually important documents. We produce them and get them signed by the customer and then we have a benchmark to work from. We skip them and have no agreement on those processes with the customer and we leave open the possibility for questions and interpretations throughout the engagement. Choose the former, not the latter.

Do the fundamental things

Produce weekly status reports. Hold weekly status calls. Meet regularly with your project team to touch base even when there isn't a lot of work going on. Maintain the project budget and resource plan meticulously. If you continually do these things regularly throughout the project and don't skip meetings you set solid expectations with your team and your customer. As a result you keep project participation high, accountability high, and customer satisfaction high.

Practice the best communication possible

Don't assume your team and your customer understand something or always know what's going on. Don't assume that everyone knows what's expected of them. Always strive to practice efficient and effective communication throughout the engagement and you'll see the results in positive ways from your team and from the satisfaction level and participation level of your customer. Communication like this is critical to the success of your project.

Conduct lessons learned sessions

Finally, don't skip the lessons learned sessions. Even though it becomes increasingly hard to focus on the project after implementation and as you and your team begin to drift to other projects, schedule this session with your team and your customer and go through the project and what happened good and bad. It's important and you'll learn from it.

Summary

We take each project individual and methodically, following best practices to achieve both success (hopefully) and, more importantly, valuable experience. Even project failures help us to become much better project managers if we learn from them.

Practice best practices, stick to the basics, document requirements well and allow for proper planning, and then communicate effectively for your best chances of success.

Wednesday, February 16, 2011

Managing the Project for Success

Managing the Project for Success

At the end of the engagement, every project is looked at as either a success or a failure. The end result of the project is going to be judged - usually by the customer, the project team, and senior company management. Just about every individual who either had a hand in the project or was somehow affected by it will have an opinion.

When judging the success of the project there are usually three key factors to look at - three key success determiners. These are:

* Was the project delivered on time?
* Was the project delivered on budget?
* Was the customer satisfied - is the delivered solution a workable solution that solves the customer's needs?

With the success criteria defined, we still must understand that there are many ways to get to the point of a successful - or failed - delivery on a project. One is luck, but I really can't go into that because no one has any control over that option. So let's look at some of the ingredients that go into good project management - some might consider these to fall under the category of best practices.

Good communication with all project parties

Communication is, in my opinion, the number one contributor to success or failure on the project. Everything - to some degree - revolves around effective and efficient communication. In order to lay the groundwork for good communication on the project, the project manager should develop a formal communication plan to that will identify what types of communication happen, when formal meetings and reports take place or are produced, who is responsible for each type of communication, and how to contact all important parties involved in the engagement. With this document in place and understood - and followed - by all, your chances for realizing efficient and effective communication in the engagement will greatly increase.

Timely delivery of status updates up and down the chain

This falls in the category of doing what you say you're going to do. During project kickoff - and hopefully in a formal communication plan - the project manager identifies when and to whom project status information will be delivered. Many project managers let this act slide or sometimes skip weekly reports and formal status calls. When that habit starts, customer satisfaction often slides with it. Deliver the information as per the agreed upon schedule. A well-informed project team leads to great project success. A well-informed customer leads to greater customer satisfaction, which is one of the key project success determiners as we previously discussed.

Continual project schedule and project budget oversight

The project manager who regularly revises and delivers the project schedule to the team and customer ensures that everyone is up to date on project tasks and what's coming in the near future. No surprises. And the project manager who is constantly monitoring and revising the project budget and overall project resource forecast will never be surprised to find that the project is 40% over budget. Why? Because it will never happen. Continual oversight and forecasting of the project budget will mean that the project manager will always be aware of the slightest deviation from the planned budget and will be able to take corrective action or at least discuss with the customer and senior management to figure out the best changes to make.

Use of repeatable processes when managing the project

Finally, nothing beats using the successful processes that have worked in the past. Luck is a good thing when it happens, but relying on it for continued project success never smart. And if you aren't using good tools and repeatable templates and processes that have brought successes on previous projects - if you aren't learning from the past - then you'll always be relying on luck. Put in place solid tools, repeatable processes that bring project consistency, and meaningful templates that project managers can use over and over again with confidence and your project success percentages will definitely rise over time.